Coronation Park, Ormskirk. A.B.3.

Client – West Lancashire District Council.
Contract period 8 weeks
1500m2 New Bitmac Footway
Ref: R Hill.
1000m2 Landscaping.

Whilst complying to stringent guide lines and intense method statements, Dowhigh installed new tarmac footways within the public park and provided complex excavations to form wet areas and ledges to the existing water course.

Through out the project dowhigh continued to
liaise with:

  M62 (Junction 5 to 6)

A.A. Hot Rolled Asphalt/Bitumen Macadam Surfacing.


Client – Knowsley M.B.C.
Contract Period – 20weeks
1,800m Beany Kerbs
15,000m2 Axoflex thin surface course
10,000 tonnes of recycled binder course

Dowhigh’s £3.4m contract involved reprofiling the motorway between junctions 5 and 6 to improve the drainage characteristics. The contract scope included;

• Laying of exinsitu recycled base course
• Laying a new binder course which was overlayed by Lafarge’s ‘Axo-flex’ proprietary thin surfacing
wearing course.
• The refurbishment of 10 gantries and seven bridges.

The contract was performed via partnering agreements with both Roadstone Recycling and Lafarge.

The project has recently been commended by the highways agency for the superior carriageway finish and the traffic management.

 
• The Environment agency
• Local businesses
• Residents